LONDON, Oct. 14 -- The Government of UK issued details related to the following business opportunity:
Contracting Authority: LondonEnergy Ltd
Industry: Construction work
Description: London Energy require works to 4 area of the Boiler house Roof Please see below description of works. The full spec including photos is available on MultiQuote. Please email lewis.atkinson@londonenergyltd.com for full scope and photos if you are unable to access via MultiQuote. - Required works: 1. Visual and physical barriers to 2no ~8x6m sections of roof Three sunken areas of roof have been patched and waterproofed from above. We now need visual and physical barriers to these areas to stop anyone walking from above. Two ~8x6m areas to be barriered off Requirement: - Paint: Hazard striped paint (yellow and black diagonal lines) to 8x6m area of roof - Barriers: Chain barriers around perimeter, 2 rows, suitable for high winds. - Signage: "Danger, Keep out, fragile roof" signage, or similar 2. Steel re-enforcement to underside of 1 off 4x4m section of steel decking One sunken area of roof has visible deterioration on the steel decking underside. Whilst no one will be walking from above, we want additional strengthening to this area, to mitigate risk of collapse from e.g. snowfall, while also keeping the ability to visually inspect from below. Requirement: - Clean and paint: Clean up and fire proof painting of existing deteriorated area of underside steel decking (approx. 2x3m) - Brackets: Mount several brackets from either steel beam, laid between the ridges, spaced at ~200mm intervals (or alternative suggestion), taking care not to pierce the roof membrane 3. Repair unadhered membrane to upstand. A large area of unadhered roofing membrane is present at the upstand. We now need this to be repaired. Approx 8 x 2m area, to mitigate risk of water ingress and damage to roof. Requirement: - Repair: Remove old felt membrane and lay new 4. Level out flood-prone area An approx. 12x1m area is prone to flooding. We require this to be levelled out so the water flows out of the area Requirement: - Works to level out the area to avoid it flooding during heavy rainfall Schedule Works to be completed during November 2025 RAMS RAMS required prior to commencing any works, Pricing Please provide individual pricing and details of what will be provided: - To access this competition: login to https://suppliers.multiquote.com and view the opportunity RA354019. Not registered on MultiQuote - visit https://suppliers.multiquote.com then register and quote RA354019 as the reason for registration. Any queries please contact MultiQuote on 0151 482 9230.
Closing date: 2025-11-07T17:30:00Z
Contract duration: 2025-11-08T17:30:00Z to 2025-12-05T00:00:00Z
Value of contract:
Location of contract: Any region
About the buyer: Lewis Atkinson; support@multiquote.com; EcoPark; London; N18 3AG; England; 0151 482 9230
Disclaimer: Curated by HT Syndication.